MCS Ltd were appointed for the Mechanical works at Castlemead Bristol. This project included the mechanical and public health installation to level 10 for Amazon.

The project consisted of design development, validation of the existing mechanical services, decommissioning of existing mechanical services, provision and installation of a new VRF system, ventilation, BMS installation and commissioning. MCS Ltd completed this work within a 8 week programme.

Scope of work – Mechanical Services

  • Design development
  • Co-ordination
  • VRF Installation
  • Modification to installed services in a live environment
  • Heating
  • Ventilation
  • Ductwork
  • Disposal Installations
  • BMS
  • Validation
  • Pre-contract water analysis
  • Decommissioning
  • Commissioning
  • Flushing
  • Balancing